Most installations take days, getting you to qualification sooner and product moving faster.
The challenge for nutraceutical operations is building a controlled environment that meets FDA facility expectations and gives customers and auditors confidence, without overbuilding or straining the budget of a scaling business. Starrco modular cleanrooms give you a right-sized, professional environment, installed fast and ready to grow with you.
Starrco modular units come with high-quality vinyl, aluminum, and FRP finishes that give a growing nutraceutical operation a polished, professional look and the smooth surfaces FDA’s 21 CFR Part 111 calls for. As product lines or volume change, the walls reconfigure and expand with the business, without demolition.
Because nutraceutical production depends on surfaces that clean quickly and hold up to routine sanitation, Starrco modular systems are designed to support:
A Starrco modular cleanroom is built to your exact specifications, whether it stands alone or integrates into your existing facility. Common nutraceutical applications include:
Most installations take days, getting you to qualification sooner and product moving faster.
Reconfigure, expand, or relocate as product lines and volume change. No demolition, no wasted investment.
One bill covers design, engineering, and manufacturing. Qualifies for a seven-year accelerated depreciation window.
Factory-finished, non-particulating surfaces support cGMP facility requirements out of the box.
We assess your space and operational requirements to provide you with an accurate quote. Most quotes are provided within 24 hours.
We develop detailed schematics for your approval, and provide everything you need to ensure a smooth project from design to installation.
Every piece is precision-engineered and pre-cut in our facility, so when it arrives, it’s ready to install.
Installers handle everything on-site. Most projects are complete and ready to use in a few days. The best part: no construction mess!
Typically none. The FDA’s dietary supplement rule sets no ISO classification, so most nutraceutical operations need a well-built, easily cleaned controlled environment rather than a classified cleanroom. When a customer or contract partner specifies a class, Starrco designs and builds modular cleanrooms to meet it.
Most Starrco installations are complete in days. Components are factory-fabricated, labeled, and delivered ready to assemble, with no cutting, sanding, or wet construction in your space. Qualification timing depends on your quality procedures.
Yes. Starrco’s panelized wall systems are designed to be reused, so rooms can be expanded, reconfigured, or relocated as product lines and volume change, without demolition.