Qualifies faster than conventional construction. Factory-fabricated panels install in days with no on-site grinding or wet finishing. Your environment is ready for particle count testing sooner, and your production timeline stays intact.
Medical device manufacturing demands controlled environments that are fast to qualify and built to comply, with the flexibility to evolve as product lines change. Starrco modular cleanrooms are engineered to meet those demands, installed in days rather than months, with non-shedding, non-particulating components that support ISO Class 5 through 8 classifications and GMP Grade A through D requirements from day one.
When your production timeline can’t wait for months of on-site construction, and your qualification process can’t tolerate the particle contamination risk that comes with on-site grinding and wet finishing, modular is the logical choice.
Our cleanrooms are factory-fabricated off-site, with every panel arriving pre-cut, pre-mitered, and labeled alongside a complete CAD drawing set. No wet construction means no particle-generating finishing work compromising your environment before qualification even begins.
And because modular reconfigures without demolition, your cleanroom investment evolves with you. As product lines expand or regulatory requirements shift, panels can be repositioned and rooms rebuilt without tearing everything down.
Because medical device manufacturing requires precise contamination control, our cleanroom systems are designed to support:
A Starrco modular cleanroom is built to your exact specifications. Our systems are compliant-ready for a wide range of medical device environments, including:
Qualifies faster than conventional construction. Factory-fabricated panels install in days with no on-site grinding or wet finishing. Your environment is ready for particle count testing sooner, and your production timeline stays intact.
Non-shedding, non-particulating components support ISO 14644 and GMP requirements from day one. Factory-finished surfaces eliminate the outgassing and particle contamination risk of on-site construction. Qualification starts from a clean, documented baseline.
Modular cleanrooms may qualify for 7-year accelerated depreciation versus 39 years for conventional construction, a significant long-term cost advantage.
Panels reconfigure, rooms expand, and layouts change without demolition. As product lines evolve and regulatory requirements shift, your cleanroom evolves with you, protecting your investment.
Starrco stands by our rapid quote turnaround. We work to provide accurate project estimates for most requests in as little as 24 hours, though some larger or more complex cleanroom projects may require additional time.
Our products are made to fit your application — whatever that application may be — now, and well into the future. Built for your business today and designed to fit your future, too.
Get your project up and running when you need it most. Starrco solutions install 70% faster than conventional construction.
Every Starrco component is precision-engineered in our controlled environments by experienced technicians. We only deliver the highest quality products.
Excellent, responsive customer service is one of Starrco’s core values. From our sales team to our engineering & design experts, everyone here cares about your end result.
Starrco cleanrooms support ISO Class 5 through Class 8 classifications, covering the most common medical device manufacturing environments. Our systems are engineered to meet the air change rates, filtration specifications, and surface material requirements for each level. Unsure which class applies to your application? Contact our cleanroom experts.
Modular construction supports GMP compliance by eliminating the on-site grinding and wet finishing that introduce particles before qualification begins. Factory-finished, non-shedding wall surfaces meet the material requirements for GMP Grade A through D environments, and every build includes a complete CAD drawing set to support your documentation process.
Most Starrco cleanroom installations are completed up to 75% faster than conventional construction. Because panels arrive pre-cut and labeled with no wet construction required, there are no extended drying or off-gassing periods before qualification can begin. Actual timelines depend on project scope and complexity.
Yes. Starrco’s modular panel system is designed to reconfigure, expand, or relocate without demolition. If your production line evolves or your facility footprint shifts, panels can be removed, repositioned, and rebuilt, protecting your initial investment.
Starrco offers three panel systems for medical device environments:
Available finishes include smooth FRP, textured FRP, painted aluminum, and vinyl.